Member ofWikov Group
References

Kaplan Turbine — HPP Čeňkovice

Published on May 25, 2026

Kaplan Turbine — HPP Čeňkovice

Project parameters

TechnologyKaplan turbine
LocationCzech Republic
Output1.2 MW
ClientČEZ, a.s.
Runner Diameter1400 mm

Supply and installation of a Kaplan turbine for a small hydropower plant on the Tichá Orlice river. Scope covered the complete machine hall, control system, and commissioning.