Member ofWikov Group
References

Kaplan Turbine — HPP Bočac

Published on May 25, 2026

Kaplan Turbine — HPP Bočac

Project parameters

TechnologyKaplan turbine
LocationBosnia and Herzegovina
Output110 MW
ClientERS, a.d.
Runner Diameter5800 mm

Refurbishment of Kaplan runners and generators at the Bočac HPP on the Vrbas river. Service life extended by 30 years.

Share this post

Stay informed

Subscribe to receive the latest engineering case studies, project announcements, and technical insights from Litostroj Power.