Member ofWikov Group
References

Francis Turbine — PSP Lipno

Published on May 25, 2026

Francis Turbine — PSP Lipno

Project parameters

TechnologyFrancis turbine
LocationCzech Republic
Output60 MW
ClientČEZ, a.s.
Runner Diameter4500 mm

Comprehensive modernization of the Lipno I pumped-storage plant — Francis runner replacement, generator rewind, and full control-system overhaul. 4.2% efficiency uplift.

Share this post

Stay informed

Subscribe to receive the latest engineering case studies, project announcements, and technical insights from Litostroj Power.